Figure 1 displays an example of the results from the preliminary model, with the output generated through the following process:
- The in-office user selects the CCTV file or folder directory of multiple files and initiates the model.
- The model then runs without human supervision through each video frame and searches for any irregularities learned during the training stage.
- If the model identifies an object (irregularity), the model outputs the following data subject to a threshold confidence level:
- If the confidence of the detection is high, the model outputs the data shown in Table 1. In addition to this output, the model can retrieve any metadata from the video file, as requested by the client. For example, if the drone is GPS enabled, then the X and Y GPS coordinates of the identified irregularity can be extracted.
- If the confidence of the detection is low, the irregularity is identified as an edge case and the model trims the video for later inspection by the in-office technician.
- The model then pushes the extracted data to a database, or the like, for record keeping.
- Once the model is complete, the in-office technician needs only review the CCTV footage of objects identified by the model with low confidence (edge cases), thereby substantially reducing the time required for the review. As the model is used, the reviewed low-confidence detections are used by the SMEC AI team to improve the accuracy of the model.
- Thereafter, the Project Engineer can assess the structured data to make data-driven decisions on the pipe replacement or point repair requirements.
Southeast Asia is poised for a hydropower transformation, with countries committing to significant capacity increases. According to the 2024 World Hydropower Outlook, Indonesia plans to expand its hydropower capacity from 6.7 GW to 72 GW by 2070.
The Sydney Metro West project is shaping the future of Sydney by providing world-class metro services that will support the city’s growth and benefit the community for generations to come. Once delivered the new 24-kilometre underground railway will connect Greater Parramatta and the Sydney CBD, doubling rail capacity and transforming the way people move.
Across the vast and diverse landscapes of rural Africa, many communities face significant barriers to accessing essential infrastructure. Limited access to clean water, sanitation, reliable transportation, and consistent energy supply impedes daily life, and deepens existing inequalities.
Over 50% of the world’s population now lives in urban areas, with the World Bank forecasting that city populations will reach 6 billion by 2045 (World Bank, 2023). As cities grapple with the pressures of rapid urbanisation, innovative solutions are essential to addressing congestion and infrastructure demands.